Home > News center > Company news
Just entered December, winter moment to hit us, the temperature dropped to five degrees below zero. The cold weather brought test of chemical safety production.
The power to ensure the equipment in winter safety work, in November 29th, held the antifreeze work this year conference topics in production meeting room. Deputy general manager Zhang Haisheng, production department and workshops mainly responsible persons attended the meeting. On the meeting, director Pan Jiantian to power equipment company of antifreeze work careful deployment, he asked the shop management, post operation and maintenance personnel to make anti freezing.
Since the beginning of winter this year, the power of antifreeze cards were issued 2800, and make anti freezing advance publicity and implementation. The relevant workshop management personnel in accordance with the requirements of inspection and antifreeze, insulation on anti freezing point. At the same time, strengthen the key parts and the key device for anti freezing point position one by one check, statistics and check, ensure not missing any part, to ensure the safe and stable operation of the device in winter.
The last one:To enhance the quality of Haoy...Next:To enhance the quality of Haoy...