Source:Compression workshop Author:zhangjun Time:2016-09-12 Read:606second
In the afternoon of September 7, 12 # compressor compression workshop 7 outlet pressure fluctuations, sudden decreased from 23.5 Mpa to 23.3 Mpa. During the transition time, after receipt of the monitor, production scheduling and post notice after the incident, the compression workshop, led to the scene immediately, investigate the cause of pressure drop. Through inspection analysis of piston ring is bad to lower pressure. Associated with section after post immediately, notify him to prepare for parking.
In the production office, under the coordination of power, compression workshop personnel shall be responsible for the repair of various hidden dangers, timely change on piston ring in seven. Use of parking time, timely cleaning one, two, four, five section of valve, flange replacement of paragraphs on the pipeline corrosion, mechanism for repair welding of companies to contact 2 water cooler weld welding place.
In the process of maintenance, the workshop leader vigorously promotes safety, quality, process control, and inspection personnel science valve lift gap measured using vernier caliper, strictly implement the "two ticket SanZhi" and three-level system of checking, on the basis of the finish the maintenance task, to ensure the safety and quality of maintenance and repair work.