Welcome to visit Anhui Haoyuan Chemical Group Co., Ltd.

News center

Trade news

Home > News center > Trade news

Chemical water will be faced with three red lines
Source:Chinese fertilizer   Time:2012-02-17   Read:1067second  

Office held a press conference on February 16, Vice Minister of Water Resources Hu 4 an interpretation of the State Council recently issued "opinions" on the most stringent water management system. The three red lines of the "views" to define the water resources management, and propose specific safeguards. In the future, including the chemical industry, including industrial water will become increasingly stringent. Hu four a detailed explanation of the three red lines. The first red line is the exploitation of water resources control the red line to the 2015 National Water and strive to control the total 635 billion cubic meters or less, controlled at less than 700 billion cubic meters in 2030. The second is to control the red line the efficiency of water use, to 10,000 yuan of industrial added value of water consumption in 2015 decreased by 30% in 2010 to 2030 the efficiency of water use at or near the world advanced level, the water consumption of 10,000 yuan of industrial added value down to 40 cubic meters. The third is water function area to limit pollutant red line to the water function zones of major rivers and lakes water quality standards in 2015 to more than 60 percent, major pollutants into rivers and lakes by 2030 the total control in the dirt holding capacity of the water function area range within the water function area water quality compliance rate increased to above 95%.
Adherence to the three red lines, "opinions" one by one the deployment of the implementation. In water resources development and utilization of control red line management to strictly implement the total amount of water control. Right to take the total amount of water has reached or exceeds the control indicators of the region, to suspend the approval of the construction project to add water; right to take the total amount of water close to the areas of control targets to limit the approval of the construction project to add water; do not meet the national industrial policy, the product does not in line with the fixed standard of the industry, water projects, the approving authority shall not be approved.
In the efficiency of water use to control the red line management, to promote price reform, accelerate the formulation of high water consumption industries and sectors of water to a fixed national standards. Construction project to develop a program of water conservation measures to ensure water-saving facilities with the main project "three simultaneous". The construction of industrial water-saving demonstration project.
In water function zones to limit pollutant red line management, to strictly control the total amount of sewage into the rivers and lakes. Strengthen the control of industrial pollution sources, the volume of sewage exceeds the water function area to limit the area of ​​row total to restrict approval of new water into the lake and river outfall.
Three red lines to truly become a "high voltage", the "opinions" that want to water resources development, utilization, conservation and protection into the evaluation and examination system, the local people's governments above the county level is mainly responsible for water resources management of the administrative regions and protection work must take.
For many companies in the amount of water on the use of underreporting, more than the less pay, the chief planner of the Ministry of Water Resources, General, Department of Planning and Programming Division, told reporters: "In the future we should focus on to solve this problem through the construction of water resource monitoring system real-time monitoring of some big water. "It is understood that the Ministry of Water Resources is working to establish a national water resources information management system, is expected to be completed in three years, and initially put into use.
 

CONTACT US

Anhui Province, Fuyang City, Fukang Road No. 1

0558-2368015 2368080

haoyuanweb@163.com

皖公网安备 34120002001531号

Message:
Name:
Telephone:
mailbox:
Technology supporter: Haoyuan Group Information Center
Technology supporter: Haoyuan Group Information Center
T
O
P