Home > News center > Company news
In order to carry out the production policy of "the lifeline of the enterprise," to improve the emergency handling capacity of the site operators in the compression workshop for oil and water leakage, the workshop was compressed in May 22nd to carry out the emergency drilling of oil and water leakage events in the position of the oil storage tank on the east side of the 5#MH compressor.
The 5#MH operator inspected the oil and water silt when inspecting the oil storage tank, and then reported the situation to the staff on duty, and the workshop immediately took measures such as "blocking, adsorption, filtering, intercepting, pumping back" and so on. After reaching the standard, the water supply and drainage channels are restored. Under the supervision of Ge Haoshan, the director of the workshop technology and the supervision of Dong Yangyang, the production and environmental protection department, the participants were able to perform the exercises successfully and successfully, and successfully completed the rehearsal task.
Through this rehearsal, it exercises the workshops' ability to cope with emergency contingency and cooperation, and improves the ability of employees to handle emergencies properly in emergency situations, and tests the maneuverability of the drill plan.
The last one:Urea workshop to run the overf...Next:Study and exchange in the urea...